back to projectsNew Dance Studio & Performing Arts Centre Phase 2

Category Education,
Client The Hammond School
Value £850,000 & £700,000
Consultants Harrison Pitt Architects
Completion 2009 & 2010

Pinington carried out the construction of this purpose built dance studio as additional facilities provide in the main performing arts centre.

The 576 sqm purpose built studio incorporates four dance studios, two linked together by a glazed moveable wall to provide a dance studio of 200 sqm, toilet and changing facilities together with state of the art sound systems to all studios.

Pinington also carried out the second phase of this development: a single storey extension to the main performing arts centre measuring 1700 sqm linked to the existing building at two door locations planned during phase 1 of the development for ease of connection.

The new development, which houses the music department, has two state of the art music studios, an editing suite, six practice rooms, offices and changing facilities and extensive use of acoustically rated materials.

The development also included providing a new car park for 50 cars together with hard and soft landscaping.

Harrison Pitt has had an excellent longstanding relationship with Pinington over the last 30 Years. We have worked with them on numerous projects of various size and project sectors and they have proven to be one of our top recommended building contractors. Most recently we have worked together on projects including Performing Arts Centre and Dance studio for a private performing Arts school in Chester. Extension and refurbishment to a large private retirement home and new modern Technical Centre comprising laboratories and offices. We are currently working together on several Caravan site projects for one of the UK’s Largest Leisure Companies and have found their expertise and knowledge in this field invaluable. Pinington are very reliable and repeatedly complete projects on time and within budget. I can confidently recommend Pinington Ltd as a solid and reliable Contractor.
– Steve Donnelly – Associate

 

 

Similar Projects

West Kirby Grammar School Science Lab Refurb

Pinington were appointed as main contractor to undertake the full strip out and refit of 4nr science laboratories and 2nr prep rooms. The works included strip out of all existing fixtures and fittings along with M&E services with new flooring, suspended ceilings, decoration, fully re-wired electrically with new LED lighting, Gas pipework and vulcathene science […]

read more

Dallam School

Pinington were appointed on this project to undertake a new timber framed two storey extension to an existing student accommodation block at Dallam School in Cumbria.   The project consisted of the formation of 12 en suite student accommodation bedrooms with the construction of the building being timber frame and a mixture of render and […]

read more

Marine Engineering Centre

This new steel framed building was a design & build project that would give the College a first-class training facility for sea cadets. The construction also included a reinforced slab, roller shutter doors, overhead crane and a demountable front façade that would enable large engines to be sited in the building upon which the Students […]

read more

Myerscough College FFIT Phase 2

Pinington were appointed to undertake a complete new build phase 2 teaching facility for the food and farming department of Myerscough College after undertaking the first phase of the works. The works involved the demolition of the existing animal holding buildings and removal of existing concrete slabs to facilitate the new build teaching block. The […]

read more

Contact Us

Please use the form to contact us. By filling out this form, you are agreeing for us to use your details to contact you. We will only use this information to support your enquiry and it will not be used for any other purpose.