West Kirby Grammar School Science Lab Refurb

Pinington were appointed as main contractor to undertake the full strip out and refit of 4nr science laboratories and 2nr prep rooms. The works included strip out of all existing fixtures and fittings along with M&E services with new flooring, suspended ceilings, decoration, fully re-wired electrically with new LED lighting, Gas pipework and vulcathene science […]

read more

Furness General Hospital Emergency Department

Pinington were appointed as main contractor to construct a new 2 storey extension to the Emergency Department at Furness General Hospital. The project was a 29 week construction period with 10 phases working around the existing live emergency department. The project itself consisted of a new resus facility with 3nr large resus bays, drugs perpetration […]

read more

The Old Fire Station Windermere

The works comprised of the refurbishment and repair to the Old Fire Station at Windermere Jetty Museum; a timber framed structure and clad building with slate roof. The tower was fully removed to allow repair and extension of the concrete base and supplementary steelwork was added to provide structural stability. Great care was taken to […]

read more

Levens Hall Café Building

Levens Hall is a Grade 1 listed building with 14th century origins located on the south bank of the River Kent. Pinington were appointed main contractor to construct a single storey café building. The construction comprised of steel frame with green oak roof trusses, on deep fill concrete foundations with a concrete beam and block […]

read more

East Lancashire Hospice

The East Lancashire Hospice project was a combination of new build and refurbishment across 5 phases of works over a 56 week contract. Phase 1 was to refurbish and extend the existing dining area to form a new catering kitchen / café area with seating and recreational spaces within the dining area. Phases 2 and […]

read more

Pre-Operative Assessment Furness General Hospital

Pinington were appointed as part of our ongoing measured term contract with Morecambe Bay NHS Trust to transform an existing ward into the new Pre-Operative Assessment Unit at Furness General Hospital. The works comprised of demolition of existing walls and removal of all fixtures and fittings, formation of new consulting, staff and treatment rooms with […]

read more