back to projectsMarine Engineering Centre

Category Education,
Client Blackpool & Fylde College
Value £1.2 million
Consultants Cassidy & Ashton
Completion 2016

This new steel framed building was a design & build project that would give the College a first-class training facility for sea cadets.

The construction also included a reinforced slab, roller shutter doors, overhead crane and a demountable front façade that would enable large engines to be sited in the building upon which the Students could gain valid experience. The project also obtained an Excellent BREEAM rating.

Similar Projects

Morecambe Road School Entrance Extension

The works consisted of a single storey infill extension to the school’s main entrance, providing an entrance area, cafe, dining area, accessible toilet, parent’s meeting room and corridor through to the existing building. There was also internal alterations to provide a new office, an opening formed between the dining area and existing hall, a larger […]

read more

West Kirby Grammar School Science Lab Refurb

Pinington were appointed as main contractor to undertake the full strip out and refit of 4nr science laboratories and 2nr prep rooms. The works included strip out of all existing fixtures and fittings along with M&E services with new flooring, suspended ceilings, decoration, fully re-wired electrically with new LED lighting, Gas pipework and vulcathene science […]

read more

Dallam School

Pinington were appointed on this project to undertake a new timber framed two storey extension to an existing student accommodation block at Dallam School in Cumbria.   The project consisted of the formation of 12 en suite student accommodation bedrooms with the construction of the building being timber frame and a mixture of render and […]

read more

Myerscough College FFIT Phase 2

Pinington were appointed to undertake a complete new build phase 2 teaching facility for the food and farming department of Myerscough College after undertaking the first phase of the works. The works involved the demolition of the existing animal holding buildings and removal of existing concrete slabs to facilitate the new build teaching block. The […]

read more

Contact Us

Please use the form to contact us. By filling out this form, you are agreeing for us to use your details to contact you. We will only use this information to support your enquiry and it will not be used for any other purpose.