back to projectsEast Lancashire Hospice

Category Healthcare,
Client East Lancashire Hospice
Value £1.06 million
Consultants Stanton Andrews Architects
Completion December 2018

The East Lancashire Hospice project was a combination of new build and refurbishment across 5 phases of works over a 56 week contract.

Phase 1 was to refurbish and extend the existing dining area to form a new catering kitchen / café area with seating and recreational spaces within the dining area. Phases 2 and 3 were the formation of new staff offices, staff facilities and to upgrade the new staircase with granite stair treads and glass balustrades. Phase 4 was to form a contemplation room and craft room with very intricate details to the contemplation room being fully round. Phase 5 was to extend two patient / family bedroom facilities to provide more space for loved ones to spend quality time with patients.

The project was extremely challenging due to the hospice staying live at all times, therefore careful consideration had to be given at all times. Lyn Stevenson Chief Executive of East Lancashire Hospice gave a special thanks to Project Manager Nick Pinington for his hard work, pragmatic approach and diligence during the project and thanked the Pinington team for the hard work and effort to achieve such a fantastic space.

Similar Projects

Royal Lancaster Infirmary The Ashton Kitchen Servery

Pinington were appointed as main contractor on the high profile fit out and refurbishment of the existing Skylight Kitchen within the Royal Lancaster Infirmary. The works on site involved a complete strip out of the existing servery and formation of a temporary servery to ensure that normal operations could continue within the restaurant area during […]

read more

Furness General Hospital Emergency Department

Pinington were appointed as main contractor to construct a new 2 storey extension to the Emergency Department at Furness General Hospital. The project was a 29 week construction period with 10 phases working around the existing live emergency department. The project itself consisted of a new resus facility with 3nr large resus bays, drugs perpetration […]

read more

Pre-Operative Assessment Furness General Hospital

Pinington were appointed as part of our ongoing measured term contract with Morecambe Bay NHS Trust to transform an existing ward into the new Pre-Operative Assessment Unit at Furness General Hospital. The works comprised of demolition of existing walls and removal of all fixtures and fittings, formation of new consulting, staff and treatment rooms with […]

read more

Bendrigg Lodge Acorn House

Acorn House at Bendrigg Lodge was to provide fully functioning disabled accommodation, living areas and full cratering kitchen. The building was a complete new build with traditional foundations and blockwork with a render finish. Internally en suite bedrooms were completed with disabled hoists in each room and full wetroom installations within the en suite bathrooms […]

read more