Group Warehouse & Offices

Pinington were appointed to undertake a full fit out of an existing open plan industrial warehouse space to form a new workshop, office and distribution hub form Group Company in Morecambe. The works consisted of a removal of all existing fixtures and fittings along with demolition of existing walls. Works then progressed into the steel […]

read more

Group Office Lancaster

Pinington were appointed to undertake a extensive refurbishment and fit out of a existing open plan office area into a sleek new high end office and meeting room for a prestigious UK client.   The works included erection of new stud walls, new suspended ceilings, extensive plastering works to new and existing walls, bespoke joinery […]

read more

Royal Lancaster Infirmary The Ashton Kitchen Servery

Pinington were appointed as main contractor on the high profile fit out and refurbishment of the existing Skylight Kitchen within the Royal Lancaster Infirmary. The works on site involved a complete strip out of the existing servery and formation of a temporary servery to ensure that normal operations could continue within the restaurant area during […]

read more

The Old Fire Station Windermere

The works comprised of the refurbishment and repair to the Old Fire Station at Windermere Jetty Museum; a timber framed structure and clad building with slate roof. The tower was fully removed to allow repair and extension of the concrete base and supplementary steelwork was added to provide structural stability. Great care was taken to […]

read more

Levens Hall Café Building

Levens Hall is a Grade 1 listed building with 14th century origins located on the south bank of the River Kent. Pinington were appointed main contractor to construct a single storey café building. The construction comprised of steel frame with green oak roof trusses, on deep fill concrete foundations with a concrete beam and block […]

read more

Hadwins Audi

The project comprised of two phases to provide a new workshop and valet centre and total refurbishment of the existing showroom. Phase 1 Demolition of the old valet centre and erection of a new 10 bay workshop and parts department including adapting part of the old building incorporating a new MOT testing facilities, canteen and toilet […]

read more