Dallam School

Pinington were appointed on this project to undertake a new timber framed two storey extension to an existing student accommodation block at Dallam School in Cumbria.   The project consisted of the formation of 12 en suite student accommodation bedrooms with the construction of the building being timber frame and a mixture of render and […]

read more

Freshwater Biological Association

Pinington were appointed by the Fresh Water Biological Association to develop buildings that had been in a state of disrepair for many years. The buildings were developed into luxury holiday lets, the properties are situated right in the heart of the Lake District, right upon the shore of Lake Windermere. These properties offer an idyllic […]

read more

Bendrigg Lodge Acorn House

Acorn House at Bendrigg Lodge was to provide fully functioning disabled accommodation, living areas and full cratering kitchen. The building was a complete new build with traditional foundations and blockwork with a render finish. Internally en suite bedrooms were completed with disabled hoists in each room and full wetroom installations within the en suite bathrooms […]

read more

Ellel House New Care Home and Private Residence

Renovating the listed Ellel House, Lancaster, with careful restoration of its historic features was just one of the challenges undertaken by the Pinington team during the construction of this mixed residential development for Hillcroft Nursing Homes Ltd. Careful consideration was taken to ensure special features were retained and restored to their former glory within the […]

read more

Bendrigg Lodge Phase 1

A project for the Bendrigg Trust which specialises in courses & activities for disadvantaged young Children. A new activity hall and lodge was built, following the demolition of some small outbuildings, over split levels with a gross floor area of 7300sq ft. The building included a 6.5m climbing wall, open plan activity hall, meeting room […]

read more

Knights Bridge Apartments

This £5.2m project comprised the construction of 32 number residential two and three bedroom apartments in two blocks together with underground parking and all associated Mechanical, Electrical services and external works. The project was tendered over a two stage tendering process and Pinington became the management contractor for the project.  Working with Capita Symonds with […]

read more