back to projectsWest Kirby Grammar School Science Lab Refurb

Category Education,
Laboratory Work,
Client West Kirby Grammar School
Value £475,000.00
Consultants Surveyors to Education
Completion August 2019

Pinington were appointed as main contractor to undertake the full strip out and refit of 4nr science laboratories and 2nr prep rooms.

The works included strip out of all existing fixtures and fittings along with M&E services with new flooring, suspended ceilings, decoration, fully re-wired electrically with new LED lighting, Gas pipework and vulcathene science lab drainage. The science laboratory furniture was then supplied and fitted by Klick Technology.

The works were undertaken over a 14 week period with the first 7 weeks of the project working around the half term of school and were complete on time and on budget with the client very happy at the end of the project.

Similar Projects

Myerscough College Croxteth Modular Classrooms

Pinington Ltd were appointed as main contractor to undertake the installation of a 2 classroom modular unit at Myerscough College’s Croxteth campus in Liverpool. The works included new concrete foundation, alterations and new sections of drainage, installation of new services to the building, external tarmac finish, fencing and installation of solar PV to an adjacent […]

read more

Morecambe Road School Entrance Extension

The works consisted of a single storey infill extension to the school’s main entrance, providing an entrance area, cafe, dining area, accessible toilet, parent’s meeting room and corridor through to the existing building. There was also internal alterations to provide a new office, an opening formed between the dining area and existing hall, a larger […]

read more

Dallam School

Pinington were appointed on this project to undertake a new timber framed two storey extension to an existing student accommodation block at Dallam School in Cumbria.   The project consisted of the formation of 12 en suite student accommodation bedrooms with the construction of the building being timber frame and a mixture of render and […]

read more

Marine Engineering Centre

This new steel framed building was a design & build project that would give the College a first-class training facility for sea cadets. The construction also included a reinforced slab, roller shutter doors, overhead crane and a demountable front façade that would enable large engines to be sited in the building upon which the Students […]

read more

Contact Us

Please use the form to contact us. By filling out this form, you are agreeing for us to use your details to contact you. We will only use this information to support your enquiry and it will not be used for any other purpose.