back to projectsUniversity of Cumbria

Category Education,
M&E,
Client University of Cumbria
Value £5,600,000
Consultants Wilson Mason Architects
Completion 2008

New build £5.6m Student Centre at the new University of Cumbria, Lancaster Campus on Bowerham Road.

Over a ground, three upper floors and plant space at roof level.  The works comprise catering and restaurant facilities, grab and go, one stop shop and open plan office space together with associated mechanical and electrical installations and external works.

Pinington were main contractor on the University of Cumbria Gateway project, the first building for the newly formed University and one which was to act as the focus for the new campus. We acted as Project Architect fro the scheme and the importance of achieving high quality was understood by all involved. The Gateway is a multifunctional building, acting as information hub, gathering area, central dining facility and main focus for the campus. As a result there were levels of complexity to both the servicing and architectural easpects of the building. In addition, the client was concerned with the environmental and sustainable aspects of the project, reflected in both the specification and the construction methods, both of which were embraced by Pinington to acheive BREEAM ‘Very Good’ rating. Pinington progressed enthusiastically through the project and were proactive in solving or avoiding problems and delays during the works. Pinington approached the build as a team member with the main aim of delivering a quality product to the end users. The overall outcome of the project was very much as hoped, and it has received (and still receives) many plaudits from staff and students using the building.
– Keith Chesire

Similar Projects

Dallam School

Pinington were appointed on this project to undertake a new timber framed two storey extension to an existing student accommodation block at Dallam School in Cumbria.   The project consisted of the formation of 12 en suite student accommodation bedrooms with the construction of the building being timber frame and a mixture of render and […]

read more

Marine Engineering Centre

This new steel framed building was a design & build project that would give the College a first-class training facility for sea cadets. The construction also included a reinforced slab, roller shutter doors, overhead crane and a demountable front façade that would enable large engines to be sited in the building upon which the Students […]

read more

Myerscough College FFIT Phase 2

Pinington were appointed to undertake a complete new build phase 2 teaching facility for the food and farming department of Myerscough College after undertaking the first phase of the works. The works involved the demolition of the existing animal holding buildings and removal of existing concrete slabs to facilitate the new build teaching block. The […]

read more

Myerscough College FFIT Phase 1

The existing farm buildings were demolished, in place a new state of the art Beef Unit constructed with modern agricultural and innovative feeding and cattle monitoring systems installed. In addition there was a new farm slurry storage and pumping facility installed to handle all the farms animal waste. The project was a design and build […]

read more

Contact Us

Please use the form to contact us. By filling out this form, you are agreeing for us to use your details to contact you. We will only use this information to support your enquiry and it will not be used for any other purpose.