Pinington were appointed as main contractor on the high profile fit out and refurbishment of the existing Skylight Kitchen within the Royal Lancaster Infirmary.

The works on site involved a complete strip out of the existing servery and formation of a temporary servery to ensure that normal operations could continue within the restaurant area during the works. Once the strip out and relocation works were complete hoardfast PVC screening was erected to fully segregate the workspace and existing finishes including floor tiling, suspended and plasterboard ceilings and all existing mechanical and electrical equipment and services.

The fit out works included new floor and wall tiling, plasterboard bulkhead, decoration works all in readiness for the new servery equipment. The Mechanical works included a new roof mounted air handling unit with new ventilation to the entire area, upgrading to the existing heating to the area and re-feeding of all existing equipment and services. The Electrical works carried out by Pinington’s in house Electrical Department included a full re-wire to the kitchen area, new LED lighting to ceilings and feature lighting to the plinths of the new units and upgrading to the existing fire alarm system.

The new kitchen servery equipment including stone worktops, stainless steel appliances and serving trays, new beverage fridges, new salad bar and various other food preparation and serving areas.

The project was a great success for all involved having minimal impact on the live day to day operations of the restaurant area and the finished product shows an extremely top quality project.

 

Similar Projects

Furness General Hospital Emergency Department

Pinington were appointed as main contractor to construct a new 2 storey extension to the Emergency Department at Furness General Hospital. The project was a 29 week construction period with 10 phases working around the existing live emergency department. The project itself consisted of a new resus facility with 3nr large resus bays, drugs perpetration […]

read more

East Lancashire Hospice

The East Lancashire Hospice project was a combination of new build and refurbishment across 5 phases of works over a 56 week contract. Phase 1 was to refurbish and extend the existing dining area to form a new catering kitchen / café area with seating and recreational spaces within the dining area. Phases 2 and […]

read more

Pre-Operative Assessment Furness General Hospital

Pinington were appointed as part of our ongoing measured term contract with Morecambe Bay NHS Trust to transform an existing ward into the new Pre-Operative Assessment Unit at Furness General Hospital. The works comprised of demolition of existing walls and removal of all fixtures and fittings, formation of new consulting, staff and treatment rooms with […]

read more

Bendrigg Lodge Acorn House

Acorn House at Bendrigg Lodge was to provide fully functioning disabled accommodation, living areas and full cratering kitchen. The building was a complete new build with traditional foundations and blockwork with a render finish. Internally en suite bedrooms were completed with disabled hoists in each room and full wetroom installations within the en suite bathrooms […]

read more

Contact Us

Please use the form to contact us. By filling out this form, you are agreeing for us to use your details to contact you. We will only use this information to support your enquiry and it will not be used for any other purpose.