back to projectsFurness General Hospital Emergency Department

Category Healthcare,
Client Morecambe Bay NHS Trust
Value £2.1 million
Consultants Mellor Architects
Completion July 2019

Pinington were appointed as main contractor to construct a new 2 storey extension to the Emergency Department at Furness General Hospital. The project was a 29 week construction period with 10 phases working around the existing live emergency department.

The project itself consisted of a new resus facility with 3nr large resus bays, drugs perpetration areas and storage. A new dedicated emergency ambulance entrance and fully covered curved steel ambulance canopy. Formation of a new main entrance area with automated sliding door controls leading into new offices and consultation rooms within the existing main entrance.

The second floor of the new extension was a large plant room to house the new air handling plant, IPS and UPS power supplies, ventilation, pumps and various other elements of plant for the large scale M&E fit out on the project. Also within the hospital a new main panel was installed to feed the new resus extension along with other areas of the hospital with new sub-main distribution cables installed down existing main corridor routes.

The project was extremely challenging not just due to the integration of various trades but also due to the short programme and various different phases and working around a live Emergency Department. However all of these obstacles have been overcome with a fantastic end product and a very happy client.

Similar Projects

East Lancashire Hospice

The East Lancashire Hospice project was a combination of new build and refurbishment across 5 phases of works over a 56 week contract. Phase 1 was to refurbish and extend the existing dining area to form a new catering kitchen / café area with seating and recreational spaces within the dining area. Phases 2 and […]

read more

Pre-Operative Assessment Furness General Hospital

Pinington were appointed as part of our ongoing measured term contract with Morecambe Bay NHS Trust to transform an existing ward into the new Pre-Operative Assessment Unit at Furness General Hospital. The works comprised of demolition of existing walls and removal of all fixtures and fittings, formation of new consulting, staff and treatment rooms with […]

read more

Bendrigg Lodge Acorn House

Acorn House at Bendrigg Lodge was to provide fully functioning disabled accommodation, living areas and full cratering kitchen. The building was a complete new build with traditional foundations and blockwork with a render finish. Internally en suite bedrooms were completed with disabled hoists in each room and full wetroom installations within the en suite bathrooms […]

read more

Ellel House New Care Home and Private Residence

Renovating the listed Ellel House, Lancaster, with careful restoration of its historic features was just one of the challenges undertaken by the Pinington team during the construction of this mixed residential development for Hillcroft Nursing Homes Ltd. Careful consideration was taken to ensure special features were retained and restored to their former glory within the […]