back to projectsFurness General Hospital Emergency Department

Category Healthcare,
ClientMorecambe Bay NHS Trust
Value£2.1 million
ConsultantsMellor Architects
CompletionJuly 2019

Pinington were appointed as main contractor to construct a new 2 storey extension to the Emergency Department at Furness General Hospital. The project was a 29 week construction period with 10 phases working around the existing live emergency department.

The project itself consisted of a new resus facility with 3nr large resus bays, drugs perpetration areas and storage. A new dedicated emergency ambulance entrance and fully covered curved steel ambulance canopy. Formation of a new main entrance area with automated sliding door controls leading into new offices and consultation rooms within the existing main entrance.

The second floor of the new extension was a large plant room to house the new air handling plant, IPS and UPS power supplies, ventilation, pumps and various other elements of plant for the large scale M&E fit out on the project. Also within the hospital a new main panel was installed to feed the new resus extension along with other areas of the hospital with new sub-main distribution cables installed down existing main corridor routes.

The project was extremely challenging not just due to the integration of various trades but also due to the short programme and various different phases and working around a live Emergency Department. However all of these obstacles have been overcome with a fantastic end product and a very happy client.

Similar Projects

Stroke Therapy Royal Lancaster Infirmary

As part of our ongoing works with Morecambe Bay NHS Trust the Royal Lancaster Infirmary new Stroke Therapy Extension was the latest in a long list of collaborative projects. This project took meticulous planning from a design, procurement and execution perspective due to the location of the works. The work site was within an existing […]

read more

Royal Lancaster Infirmary Ward 50 Diabetes Unit

Pinington were appointed as main building contractor to undertake the new Diabetes unit which included an extensive internal refurbishment and remodelling to an existing physiotherapy ward and a new entrance extension forming a lobby and extended waiting area. The works included an extensive demolition and alterations period and incorporated vast amounts of new M&E equipment […]

read more

Westmorland General Hospital Water Tanks

Pinington Ltd were appointed to undertake a large scale upgrade of the existing backup water tanks and plate heat exchanger to Westmorland General Hospital Kendal.   The works comprised of the removal of the existing external water tanks, the erection of a new build masonry and cladded building to house the new water tanks and […]

read more

Carnforth Free Methodist Centre

Carnforth Free Methodist Centre proved to be our second church / conference centre handover in January 2022. Again another project hampered and hamstrung by the Covid19 pandemic got off to a slow start however very quickly ramped up to provide a fantastic facility for all involved. Our first involvement when tendering this project was to […]

read more

Contact Us