Testimonials
Mason Gillibrand Architects
Pinington’s worked with us on an innovative and challenging project to create a woodchip fired district heating system for a large Grade II listed Girl Guiding training...
... read more
News
20.12.11
Pinington on Tourer 2012
Caravan Club Project Awards
Following recent project and bid successes, we are pleased to inform you of our strengthening of relationship and project portfolio for The Caravan...
... read article
11.11.11
Business Development
We are pleased to announce that Ian Powell has been appointed to head up the Business Development of the business. Ian will focus on improving company standards strengthening...
... read article
10.11.11
ISO 9001:2008 Retained
On the 31 October we underwent our annual surveillance with The British Assessment Bureau and we are pleased to announce that we have met the requirements of the...
... read article
Recent Projects
Pinington carried out the second phase of this development: a single storey extension to the main performing arts centre measuring 1700 sqm linked to the existing building at two door locations planned during phase 1 of the development for ease of connection.
The new development, which houses the music department, has two state of the...
find out more
Pinington carried out the construction of this purpose built dance studio as additional facilities provide in the main performing arts centre.
The 576 sqm purpose built studio incorporates four dance studios, two linked together by a glazed moveable wall to provide a dance studio of 200 sqm, toilet and changing facilities together...
find out more
This pioneering energy efficient project partly funded by the Carbon Trust delivered a new biomass heating system to replace the separate systems which fed the existing buildings and associated storage buildings at Waddow Hall, Training & Activity Centre just outside Clitheroe.
The works comprised of three separate buildings; new...
find out more
This Design & Build project designed by HPA Architects of Lancaster with Structural design by Addison Projects and Mechanical & Electrical by ourselves to provide open plan office space, design studio and four laboratories linked to the existing building over two floors.
Constructed using a steel frame with suspended concrete...
find out more
Pinington extended and refurbished this care home in a phased development to ensure the operation of the business was kept running at all times.
Phase 1 involved the construction of a new build 3 storey extension to the side of the existing building which included 15 en-suite bedrooms, new main entrance, offices and living space. The...
find out more
Situated in the desirable location of Haverbreaks in Lancaster this run down house underwent major refurbishment and extension into a new 4 bedroom family home.
Featuring: Galleried entrance hall, Master Bedroom with Dressing Room, Double Garage and landscaped gardens
find out more
This project entailed the remodelling of internal space together with an infill extension to form a new dining hall, toilets and tuck shop.
The extension was formed from structural steel, cladded in curtain walling and Eternit cladding to give a modern open aspect to the facility.
find out more
This fast track project over just 10 weeks entailed the external refurbishment of three blocks of student accommodation situated in the heart of Lancaster adjacent to Lancaster Canal with the internal refurbishment to one of the blocks.
The works involved; the replacement of all rainwater goods, replacement balcony balustrades,...
find out more
The project was to demolish an existing single storey lean to building and construct a new 2 storey wrap around extension on the existing building cutting into the existing landscape. The ground floor added a foyer area, male, female and disabled toilets, a new kitchen, 4 large storage rooms and a new entrance to the existing building...
find out more
A project for the Bendrigg Trust which specialises in courses & activities for
disadvantaged young Children.
A new activity hall and lodge was built, following the demolition of some small
outbuildings, over split levels with a gross floor area of 7300sq ft. The building
included a 6.5m climbing wall, open plan activity hall,...
find out more
Construction of a new swimming pool and leisure facility including children’s
splash pool, male & female changing rooms, toilets, sauna, all associated
Mechanical & Electrical services and external works.
The project was managed by Pinington to a fixed budget by the client. This
involved working closely with the...
find out more
This £5.2m project comprised the construction of 32 number residential two
and three bedroom apartments in two blocks together with underground
parking and all associated Mechanical, Electrical services and external works.
The project was tendered over a two stage tendering process and Pinington
became the management...
find out more
The project comprised of two phases to provide a new workshop and valet
centre and total refurbishment of the existing showroom.
Phase 1
Demolition of the old valet centre and erection of a new 10 bay workshop and
parts department including adapting part of the old building incorporating a
new MOT testing facilities, canteen and...
find out more
New build £5.6m Student Centre at the new University of Cumbria, Lancaster
Campus on Bowerham Road. Over a ground, three upper floors and plant
space at roof level. The works comprise catering and restaurant facilities, grab
and go, one stop shop and open plan office space together with associated
mechanical and electrical...
find out more
The project comprises the strip out and refurbishment of the existing bar
facility. This project was value engineered between all parties to enable the
project to take place. Due to its fast track programme our in house
mechanical and electrical department and joinery manufacturing facility
ensured the project was completed on time...
find out more
Construction of a new extension, forming eight additional en-suite
bedrooms, together with the refurbishment of the existing building
including the installation of a lift and associated external works. The
new building was completed first to enable residents to be decanted for
the refurbishment works to proceed.
find out more
Purpose built 64 bedroom nursing home all rooms with en-suite facility
and associated circulation areas, staff rooms and reception.
find out more
Conversion of out buildings with extensions to link to the existing
building to form additional en-suite bedrooms along with the refurbishment
of the existing nursing home.
find out more
- 1 of 2
- ››



