Greenroyd Residential Home, Lancaster
Pinington extended and refurbished this care home in a phased development to ensure the operation of the business was kept running at all times.
Phase 1 involved the construction of a new build 3 storey extension to the side of the existing building which included 15 en-suite bedrooms, new main entrance, offices and living space. The construction included the installation of a grey water system, to serve all the toilets on the project, and a new boiler plant linked into the existing system temporarily.
Once complete the client moved all the residence from the existing building into the new extension to allow for the refurbishment of the existing building.
The existing building was totally refurbished up grading the existing bedrooms all to en-suite extending the new heating system and relocating the kitchens including new state of the art equipment